外国网站惊现中国重大工程:航空母舰建造信息!
(2007-03-11 13:23:51)
下一个
弹射器、拦阻索、特种甲板钢------德阳二重集团(已交付或部分交付)
catapult, arresting gear, special steel deck - Deyang 2nd heavy limited - I think this is the website for one of the subsidiary of this company?
http://www.ldjcj.cn/newEbiz1/EbizPor...tml/index.html
This place is somewhere in Szechuan
fully delivered or party delivered already
舰体------------沪东中华集团 长兴岛(未知)
ship hull - Hudong Zhonghua in Changxin (no confirmation)
舰用轴承--------哈尔滨轴承集团 (已交付)
Ship bearing - Harbin Bearing Limited (already delivered)
This is their website http://www.bearinghrb.com/
锅炉配件--------哈尔滨锅炉厂 (已交付)
Boiler accessories - Harbin Boiler factory (already delivered)
website http://www.hbc.com.cn/
特种舰艇板材----鞍山钢铁、宝山钢铁 (已交付)
special ship plate - Anshan steel http://www.ceie.com.cn/ (delivered)
Baoshan steel - http://www.baosteel.com
舰载机----------601所 (在研)
naval fighter - SAC (in development)
舰艇设计--------中船重工701所 (技术冻结或已定型)
Ship design - CSIC 701 institute (finalized design)
配套舰船--------江南重工、沪东中华 长兴岛 、大连重工、黄埔造船(已开工)
escorts .... you guys know
配套核潜艇------葫芦岛厂、江南重工 长兴岛 (已开工或准备开工)
submarines - you guys also know
辅助舰----------沪东中华 长兴岛 、黄埔造船、广船(已开工)
replenishment ship - 886/887
训练舰----------大连重工 (已开工)
training ship - Dalian - Varyag
与航母有关的工程代号:
carrier related projects
中央02工程 ,又称国家重大工程、国家02工程,即航母训练舰,据说工程节点要求保证09年服役。
http://chinaneast.xinhuanet.com/2004...nt_3315379.htm
called the national 02 project, for training carrier, apparently the project requires to be in fleet by 2009. The link says nothing, except planned expansion of Dalian.
048工程 即2004年8月批准,这个代号有可能是指整个国产航母工程包括其配套的子工程,也有可能仅指国产航母工程 。
project 048, approved in August of 04, could be talking about the entire carrier project including the escorts and such or just the carrier project
http://www.chinamil.com.cn/site1 ... /content_497657.htm
609工程 可能指国产舰载机工程,歼11舰载型,设计参考了SU33,据称已被新代号取代,具体未知。
609 project, possibly the naval fighter project, based on J-11, studying from su-33
传闻中的方案:
A方案:标排4.8万吨、满排6万吨,常规动力,弹射起飞,50架左右。
B方案:标排4.8万吨、满排6万吨,核动力,弹射起飞,50架左右。
2 possibly plans:
A - 48000 tonne standard load, 60000 tonne full load, conventional powered, with catapult, about 50 fixed, rotary
B - same except for nuclear powered
国产航母工程现状的猜测和传言:
more rumours
1、9985工程,即中央99年批准的航母工程,计划04年下水,后未名原因被下马,该方案为标排3万吨、 满排约4.5万吨,常规动力,弹射起飞。
project 9985, approved in 99 to be launched by 04, but got canned for some reason.
2、关于048工程,传言:至少已存在有以研究为目的航母模块或平台一个,但还未开工。
just project 048, studying a carrier model?